Two declarations of municipal accomplishment: the Town of Somerset’s completed Pool Bridge repairs and its commitments to Inclusion and Sustainability. The bridge is open. The larger question of access remains. Composite illustration based on Town of Somerset materials, November 2026. AJL + SGPT.
Andrew J Lewis
I. An experiment in Somerset
Among Somerset’s five founders in 1890 was Daniel Elmer Salmon, the pioneering veterinary scientist for whom the bacterium Salmonella was named. His work helped establish the scientific foundations of modern food safety.[1]
One hundred and thirty-six years later, the Town of Somerset still struggles to provide an accessible pedestrian connection through the Little Falls Branch corridor.
Dr. Salmon would presumably find the situation difficult to stomach. The historical irony is considerable.
Somerset began as a speculative real-estate venture organized by federal scientists. Its promised broad avenues remained muddy roads. Residents constructed wooden sidewalks, repaired streets, and struggled to maintain the crossings children needed to reach school.
By 1905, voluntary cooperation had proved insufficient. Only about one-third of the settlement’s thirty-five households reliably contributed money or labor toward maintenance.
So the residents did something sensible. They established a government. Incorporated on April 5, 1906, Somerset acquired the authority to levy taxes, enact ordinances, and provide the public services necessary to sustain a functioning community.[1]
Its first full-year municipal budget, for 1907–1908, allocated $350 of $511—68.5 percent of all planned expenditures—to maintaining and lighting streets and sidewalks. Within months, the Town Council discovered that the appropriation was insufficient and began exploring additional revenue, including reassessing property. A $2 dog tax followed.[2]
Somerset’s first government devoted more than two-thirds of its budget to streets, sidewalks, and lighting. It promptly discovered that wasn’t enough. The Town has been working on the problem ever since.
In 1913, Somerset authorized up to $10 to construct a bridge over Little Falls Branch so children could reach the E. V. Brown School, in what is now Friendship Heights, without having to ford the stream.[3]
Somerset was building bridges toward Friendship Heights before Friendship Heights existed as the municipality we know today. One hundred and thirteen years later, we are still discussing how to cross the creek.
One hesitates to call this progress.
Somerset has since become a community of considerable accomplishment, home to distinguished scientists, scholars, physicians, jurists, public officials, and entrepreneurs. Yet thirty-six years after President George H. W. Bush signed the Americans with Disabilities Act, this prosperous municipality still lacks a reliably accessible pedestrian connection through its public parkland.[4]
At the very bottom of the Town’s homepage appear its commitments to Inclusion and Sustainability. Both are admirable. Both should be achievable in the same place.
Consider the Marnie Shaul Path.
During 2026, the infamous Snowcrete winter conditions interrupted passage for more than three weeks, by my reckoning. In May, a deteriorating wooden bridge near the swimming pool closed for approximately another week of repairs. I had warned Town officials about its condition some four years earlier.
The ensuing municipal updates documented the bridge’s repair with a level of photographic and procedural detail ordinarily associated with the coordination of a lunar landing. One could almost hear Mission Control announcing the successful placement of another plank.
Then remedial construction in neighboring Friendship Heights and Page Park closed the path again, beginning August 21.
But huzzah, Dr. Salmon! On November 12, Somerset announced that the Marnie Shaul Path had reopened! Residents were instructed to remain on the path and keep dogs off the newly planted grass.[5]
The autumn closure alone lasted 83 days. Including the reported winter and bridge interruptions, the year’s total approaches 111 days, depending on how precisely we define open.
This calculation assumes the trail was otherwise dry, firm, free of mud, ice, and slippery leaves, and suitable for passage in every season. Maryland’s weather has not yet agreed to these conditions.
Nor does reopening the path make it wheelchair accessible. It remains an unpaved nature trail, not an independently usable, all-weather transportation connection.
The ADA did not require every woodland trail to be paved. But thirty-six years ought to be sufficient time to investigate how an accessible connection might be provided.
Somerset’s founders established municipal government because inadequate infrastructure and voluntary cooperation could not meet their needs.
If their successors cannot solve the contemporary problem alone, perhaps it is time to involve the larger government.
II. Vinton Park, or the public bargain
Vinton Park was not simply a piece of woodland Somerset happened to preserve.
It was assembled through decades of land acquisition, municipal borrowing, developer negotiations, County planning, and requests for substantial State assistance.
The 1970 Bethesda–Chevy Chase Master Plan identified the relevant land for park use. The 1974 Friendship Heights Sector Plan reiterated that objective. Somerset pursued acquisition both to preserve the Little Falls Branch stream valley and to buffer its residential neighborhood from more intensive development.[6]
In June 1979, the Maryland Board of Public Works approved $308,948 in Program Open Space assistance for an additional 1.79 acres of Vinton Park. In November 1980, Somerset requested another $313,552, bringing the proposed State contribution to $622,500 against an allowable acquisition cost of $830,000.[7]
The supplementary request was deferred. The final award and disbursement records remain to be recovered.
But the initial approval, subsequent application, and Town testimony establish something independently important: Somerset deliberately enlisted larger public institutions in preserving this landscape.
Mayor Walter J. Behr described earlier municipal borrowing and expenditures, including approximately $40,000 spent on a separate Vinton Park addition in 1976. He presented the acquisition as part of a sustained effort to preserve open space, protect the stream valley, and control the boundary between residential Somerset and surrounding development.[8]
These were substantial commitments by a small municipality. Preservation meant removing development opportunities, assuming financial obligations, and reshaping the relationship between Somerset and its neighbors.
It was simultaneously an environmental investment and a land-use decision.
What, then, did Maryland and Montgomery County understand they were helping to accomplish?
The records establish a public commitment to preserving parkland and the stream valley. They do not establish that officials in 1980 promised a paved, wheelchair-accessible route. The ADA would not become law for another decade.
But preservation was not the end of the public conversation.
In March 1998, M-NCPPC’s adopted Friendship Heights Sector Plan recommended a bicycle connection north through Somerset, linking surrounding communities to Willard Avenue Park and other destinations. It acknowledged that Somerset had already considered crossings over Little Falls Branch and called for continued efforts toward a mutually satisfactory solution.[9]
The public objective had expanded from preserving the landscape to connecting it.
Today, Somerset owns Vinton Park, while M-NCPPC operates nearby Willard Avenue Neighborhood Park, which includes a paved path. The stream corridor is a shared geographic system even where ownership and authority differ.
How does a decades-long commitment to preserving public parkland become a commitment to making that parkland meaningfully accessible and connected?
The answer need not be to pave every woodland trail. Environmental constraints remain important. An accessible route might require a different alignment, improved crossings, or several coordinated investments.
But preservation, recreation, and regional connectivity are not mutually exclusive public purposes.
Would the officials who worked on these projects in 1979, 1980, and 1998 regard the present pedestrian network as fulfilling their objectives?
Or would they expect their successors to finish the work?
Nearly half a century later, that seems a reasonable question to put to Montgomery County.
III. Thirty years of planning, and a century of municipal autonomy
The problem is hardly new.
On November 18, 1993, The Washington Post published Shanthy Nambiar’s account of a controversy in neighboring Friendship Heights. A former councilmember had pruned bushes in a park bearing her name. The Village Council voted to rename the park.
The disputed horticultural damage was estimated at $700.
The article also recalled an earlier disagreement over paving the park’s path for wheelchair accessibility.[10]
In July 1996, architect Roger K. Lewis examined Friendship Heights’ disconnected street network and the difficulties facing County planners seeking better connections between the district and surrounding neighborhoods.[11]
Then came a remarkably specific proposal.
On page 100 of its March 1998 Friendship Heights Sector Plan, M-NCPPC recommended a bicycle connection north through Somerset, identifying links to Willard Avenue Park, the Capital Crescent Trail, Metro, shopping, and surrounding neighborhoods.[9]
The plan recorded Somerset’s earlier consideration of crossings over Little Falls Branch and called for a mutually satisfactory solution, taking account of environmental impacts, stream erosion, security, and feasibility.
Twenty-eight years later, these remain perfectly reasonable subjects for a meeting.
The plan’s Figure 40 mapped a proposed bikeway network; Figure 44 situated the Little Falls Stream Valley within the area’s open-space system.[9]
Montgomery Planning’s March 2024 Friendship Heights Urban Design Study again examined the area’s pedestrian and open-space networks, including limited connections along Somerset’s wooded edge.[12] Its November 2025 engagement report recorded 84 Somerset questionnaire respondents, offering additional evidence of pedestrian travel between the communities, though not a representative population survey.[13]
The 2026 sector-planning process again addresses pedestrian connectivity, parks, environmental resources, and surrounding neighborhoods.[14]
The County has been considering versions of this problem across four decades.
Somerset, meanwhile, has exercised municipal autonomy since 1906.
Its record includes prolonged Bergdoll tract litigation and negotiations; the 1988 deannexation of approximately eighteen acres amid concerns about development and political representation; opposition to a County transportation proposal in 2016; and organized advocacy concerning Maryland housing legislation in 2026.[15][16][17][18]
These were different disputes involving different purposes and legal authorities. They do not establish a single municipal motive, nor do they prove Somerset obstructed a particular pedestrian project.
They do demonstrate a recurring willingness to employ legal, political, and jurisdictional tools when regional initiatives intersect with local priorities.
Somerset has also demonstrated considerable administrative continuity. Two successive town-manager departures were followed by the elevation of deputies.
One departing manager recalled that a streetlight modernization project had remained under discussion long enough for an entire lighting technology to become obsolete before the Town finally installed LEDs.[19]
This was offered, quite reasonably, as a story of municipal progress.
Montgomery County should take this history seriously—not as evidence of misconduct, but as evidence of how intergovernmental projects unfold.
Regional plans identify connections. Municipalities protect their prerogatives. Agencies exchange correspondence. Decades pass.
A project needs more than a shared aspiration. It needs authority, funding, decisions, and an implementation mechanism.
IV. What has Montgomery County been doing?
Montgomery County is not one institution. It is a collection of governments, agencies, boards, and public authorities whose responsibilities intersect in ways not always apparent to the people depending on them.
Montgomery Planning develops regional land-use and transportation recommendations. Montgomery Parks manages Willard Avenue Neighborhood Park. Both belong to M-NCPPC, a State-created bi-county agency rather than a County executive department.
The Montgomery County Department of Transportation (MCDOT) manages infrastructure within its jurisdiction. The Departments of Permitting Services (DPS) and Environmental Protection (DEP) exercise distinct construction, stormwater, and environmental responsibilities.
Montgomery County Public Schools (MCPS), governed through the Board of Education, operates Somerset Elementary School.[20]
These distinctions matter legally.
They matter rather less to a child trying to reach school, a resident traveling to Friendship Heights, or someone using a wheelchair who encounters an impassable crossing.
Consider Somerset Elementary.
The relevant infrastructure is not merely the school building or its adjacent sidewalk. It is the journey from home to classroom, including crossings, curb ramps, sidewalks, and connections between neighborhoods.
What routes does MCPS assume families can use? Which are independently accessible? How do school transportation policies account for barriers outside school property? Which agencies are responsible for correcting them?
These are questions to investigate, not invitations to invent explanations for school attendance patterns.
The same questions apply to Vinton Park.
Montgomery Planning has repeatedly identified regional connections. Montgomery Parks manages adjoining land. County agencies regulate activities affecting portions of the stream corridor. Somerset owns the municipal park.
What has each institution proposed? What public money has been committed and actually spent? Which improvements were constructed? Which proposals were rejected, deferred, or never advanced beyond a planning document?
And when disagreements arose, what decisions followed?
The 1998 plan is particularly revealing. It recorded Somerset’s prior consideration of stream crossings and recommended further efforts toward an agreement.
We should now be able to determine what those efforts consisted of, what decisions were reached, and why the intended connection remains incomplete.
If an accessible alignment is environmentally infeasible, explain why. If another route is preferable, identify it. If Somerset’s consent is indispensable, establish where. If an agency can act independently, identify its authority.
And if the obstacle is money, produce the estimate.
The purpose is not to make every agency responsible for everything.
It is to prevent the spaces between their responsibilities from becoming permanent barriers to public access.
V. A modest request of the leviathan
Somerset was incorporated in 1906, when Montgomery County was still largely rural.
Over the following 120 years, the County grew into a major metropolitan jurisdiction while Somerset retained its distinctive municipal identity and considerable autonomy.
The relationship occasionally resembles that between the British government and one of its more eccentric early colonies.
The metropolitan authority develops elaborate systems of administration. The colony preserves its customs, guards its prerogatives, and periodically informs the larger government that its latest proposal is unacceptable.
For a time, benign neglect may seem the easiest arrangement.
Somerset has produced many admirable things: a beautiful landscape, a strong civic culture, and generations of accomplished residents.
It has also preserved jurisdictional arrangements through which public connections must somehow pass.
At some point, one wonders whether Montgomery County might come and collect the experiment for further study.
Not annex it. Not abolish it. Simply investigate how a community founded by scientists, surrounded by regional public institutions, has arrived at this particular result.

Abraham Bosse, frontispiece to Thomas Hobbes’s Leviathan (1651). The sovereign’s body comprises the people whose collective authority it represents. Three hundred seventy-five years later, Montgomery County has assembled an impressive apparatus of public government. Might we trouble it to investigate a pedestrian crossing? Image: British Library.
Thomas Hobbes’s Leviathan, published in 1651, imagined a sovereign capable of overcoming the disorder arising from divided and competing powers. Its famous frontispiece depicts a giant whose body is composed of the people whose collective authority it represents.[21]
Modern American government is not Hobbes’s sovereign. Its powers are divided, limited by law, and subject to democratic accountability.
But the underlying question remains useful.
What can public institutions accomplish together that their fragmented jurisdictions cannot reliably accomplish separately?
Montgomery County, M-NCPPC, and MCPS collectively possess considerable planning, engineering, environmental, educational, financial, and administrative capacity.
Might we trouble them to investigate a pedestrian connection?
The County need not possess unlimited authority over Somerset to examine and exercise the powers it already has.
It can review regional planning assumptions, identify public-access obligations, investigate environmental and accessibility constraints, establish where municipal consent is required, and determine what its institutions can lawfully fund, approve, coordinate, or construct.
Where authority ends, the responsible agency can explain why.
Where it exists, the agency can decide whether to act.
Somerset’s founders established a government because voluntary cooperation had failed to provide essential infrastructure.
Their successors now inhabit a far larger public system. The question is whether that system can do what its institutions were created to do.
The era of benign neglect has had a respectable run.
VI. Ninety days to decide
Earlier this month, The Coherence Portfolio proposed The Somerset Seven, or seven initiatives for Somerset’s next seventy years, a coordinated set of civic investigations and potential projects.
The Marnie Shaul Path is one initiative. The broader Pedestrian Ecology Compact is another.
Together, they offer an opportunity to examine Vinton Park as part of a regional network connecting parks, neighborhoods, schools, and transit.
The proposal calls for a 90-day period of investigation, coordination, and decision-making, beginning on a mutually agreed date no later than January 15, 2027.
Not ninety days to reconstruct a stream valley.
Ninety days to establish ownership and access rights; identify legal authorities and public obligations; assess accessible design alternatives and environmental constraints; trace past expenditures and potential funding; and determine who can authorize, finance, construct, and maintain a feasible improvement.
MCPS should participate in assessing school access. Montgomery Planning and Montgomery Parks should help reconcile regional plans with the actual park network. Relevant County departments should identify their powers and responsibilities.
Montgomery County could sponsor this investigation in cooperation with M-NCPPC, MCPS, Somerset, Friendship Heights, and other affected institutions.
The Coherence Portfolio would welcome a defined, compensated professional engagement to undertake research, coordination, and project development. Public agencies would retain authority over land, permits, appropriations, construction, and maintenance.
At the end of ninety days, the institutions should be able to answer four questions:
What can be built? Who can authorize it? What will it cost? Who is prepared to proceed?
As discussed in What Somerset Can See, or the FY2027 budget as a map of municipal attention, public budgets reveal what institutions are organized to accomplish.
And Pedestrian Ecology, or the sidewalk is not the system argues that individually maintained facilities do not necessarily produce a usable journey.
Somerset has the land, the talent, and its declared commitments to inclusion and sustainability.
The surrounding public institutions have the regional responsibilities and technical capacity to examine the larger problem.
One hundred and thirty-six years after Dr. Salmon helped establish Somerset, perhaps the experiment is ready for another round of scientific inquiry.
January 15, 2027, would be an excellent time to begin.
Sources and notes
[1] Somerset’s founding, incorporation, and Daniel Elmer Salmon. Town of Somerset municipal histories and Resource Guide, as discussed in The Town of Somerset, or a history of preservation. The founding settlement dates to 1890; incorporation occurred April 5, 1906. Town historical accounts describe muddy roads, wooden sidewalks, school access, and inadequate voluntary contributions to maintenance. Salmonella was named in Daniel Elmer Salmon’s honor, not because he personally discovered the organism. Town of Somerset. ↩
[2] Somerset’s first municipal budget. Helen H. Jaszi, Town of Somerset History — Beginnings (1981), p. 3, reports the approved 1907–1908 budget of $511, including $350 for maintenance and lighting of streets and sidewalks. The allocation represents 68.49 percent of planned expenditures. Jaszi also describes the subsequent recognition that the appropriation was insufficient, discussion of property reassessment, and adoption of a $2 dog tax. These are budgeted amounts, not independently audited expenditures. Official Town history. ↩
[3] The 1913 school crossing. Town of Somerset, 2025 Resource Guide, historical chronology, records authorization of up to $10 for a bridge over Little Falls Branch because children had to ford the stream on their way to school. Helen H. Jaszi, Town of Somerset History — Beginnings (1981), identifies the school as the E. V. Brown School, approximately one mile from Somerset, in the area now known as Friendship Heights. The sources establish the need and authorization, but not that the bridge followed today’s Marnie Shaul Path alignment or that construction was completed. 2025 Resource Guide · 1981 Town history. ↩
[4] Americans with Disabilities Act. Public Law 101-336, signed July 26, 1990. Title II governs nondiscrimination by state and local governments. The anniversary provides historical context, not a finding that the existing nature trail violates a particular ADA design standard. U.S. Department of Justice. ↩
[5] Somerset municipal notices, 2026. Town communications concerning May 7–8 bridge repairs, August 21 closure, October 15 and November 5 updates, and November 12 reopening. The 83-day autumn closure is calculated from August 21 through November 11 inclusive. Winter and bridge durations remain approximate. The author’s earlier warnings are firsthand testimony. The lunar-landing comparison is editorial satire, not a quotation from municipal communications. ↩
[6] County planning and acquisition history. Mayor Walter J. Behr’s November 25, 1980 testimony before the Maryland Board of Public Works identifies the 1970 Bethesda–Chevy Chase Master Plan and 1974 Friendship Heights Sector Plan as recommending the land for park use. ↩
[7] Maryland Board of Public Works, November 25, 1980. Secretary’s Agenda, Item 8A, Program Open Space POS #1304-15-145, Vinton Park Addition. The record identifies $308,948 approved June 6, 1979, an additional $313,552 requested, a proposed $622,500 State contribution, and an $830,000 allowable acquisition cost. The supplemental request was deferred. Final grant disbursement is not established. Board proceedings. ↩
[8] Municipal expenditures and purposes. Mayor Walter J. Behr’s November 25, 1980 statement describes municipal borrowing, prior parkland acquisitions, and approximately $40,000 spent on a separate Vinton Park addition in 1976. It identifies preservation of the Little Falls Branch stream valley and buffering residential Somerset from more intensive development as acquisition objectives. ↩
[9] M-NCPPC, Friendship Heights Sector Plan, March 1998. Printed p. 100, including the recommendation for a connection north through Somerset, previously considered Little Falls Branch crossings, environmental and feasibility considerations, and a mutually satisfactory solution. See Figures 40 and 44. Full plan. ↩
[10] Shanthy Nambiar, “Quiet Spot Becomes Zone of Controversy.” The Washington Post, November 18, 1993. Concerns Page Park in Friendship Heights and an earlier accessibility dispute, not a documented Somerset rejection of Marnie Shaul Path paving. Article. ↩
[11] Roger K. Lewis, “Future of Friendship Heights Challenges Montgomery Planners.” The Washington Post, July 6, 1996. Article. ↩
[12] Montgomery Planning, Friendship Heights Urban Design Study, March 2024. Pedestrian and open-space network analyses. Full study. ↩
[13] Montgomery Planning, Friendship Heights Sector Plan Engagement Summary, November 2025. Voluntary Somerset questionnaire, 84 respondents; results are not a representative population survey. Report. ↩
[14] Montgomery Planning, Friendship Heights Sector Plan Update, 2026. Planning Board Public Hearing Draft designated July 16, 2026; adoption status should be checked before publication. Project page. ↩
[15] Bergdoll tract. Funger v. Mayor and Council of Somerset, 249 Md. 311 (1968), and The Washington Post reporting, 1983–1984, on the long-running land-use disputes. ↩
[16] Somerset deannexation, 1988. The Washington Post, March 22 and April 2, 1988. Reports approximately 18 acres removed following a 486–110 referendum. ↩
[17] River Road widening, 2016. Montgomery County Council Planning, Housing and Economic Development Committee packet, March 14, 2016, including Somerset’s March 9 letter opposing proposed widening. Committee packet. ↩
[18] Maryland housing legislation, 2026. February 4 correspondence concerning Somerset/Chevy Chase Village amendments to SB 36/HB 239, and subsequent municipal coalition activity. Lobbying expenditures require separate verification. ↩
[19] Somerset municipal management. Town-manager farewell correspondence dated March 14, 2024, describing the prolonged streetlight modernization project and administrative transitions. ↩
[20] Public agencies. Montgomery Planning · Montgomery Parks · MCDOT · DPS · DEP · MCPS. Specific authority over the corridor requires parcel-level investigation. ↩
[21] Thomas Hobbes, Leviathan (London: Andrew Crooke, 1651), frontispiece. Engraving by Abraham Bosse. British Library, shelfmark C.175.n.3. View the British Library’s digitized frontispiece. ↩
Research note: The Somerset Seven and its proposed 90-day process have not been approved or funded by the public agencies named. This essay does not establish an ADA violation or a legal power to compel construction on Somerset-owned land.